What the price covers

A visit by a structural engineer, measuring the cracks, assessing the cause and a short note with a recommendation. Without geotechnical boreholes.

What moves the price

Geotechnical samples and longer monitoring with crack gauges cost extra. A fixed price can usually be agreed in advance.

How Tjekhuset uses the figure

When the condition or electrical report has a finding that needs engineer's assessment of settlement, the full report puts this interval on the finding, adjusted for the region and the size of the job, and adds the amounts up to one figure for the negotiation. Upload the reports and start with a free summary.

Sources

Tjekhuset pristabel v2: engineering firms' published rates 2025, craftsman hourly rates 2026; checked 2026-10-16, intervals trimmed 2026-11-07

Indicative prices incl. VAT for a typical Danish house or apartment. The price table was last updated 2026-11-22. Tjekhuset is not a building surveyor; always get a quote before you decide.