What the price covers
Raking out along the crack, possibly bedding reinforcing bars in the joints, and repointing with matching mortar. Per metre of crack, incl. materials.
What moves the price
Reinforcement (helical bars) and replacing cracked bricks push the price up. If the crack is still moving, the cause must be found first, typically settlement or a missing movement joint.
How Tjekhuset uses the figure
When the condition or electrical report has a finding that needs raking out and repointing a crack per m, the full report puts this interval on the finding, adjusted for the region and the size of the job, and adds the amounts up to one figure for the negotiation. Upload the reports and start with a free summary.
Sources
Tjekhuset pristabel v2: craftsman hourly rates 2026, price guides 2025/2026 (revnereparation); checked 2026-10-16, intervals trimmed 2026-11-07
Indicative prices incl. VAT for a typical Danish house or apartment. The price table was last updated 2026-11-22. Tjekhuset is not a building surveyor; always get a quote before you decide.